With the 3 row system, the scaffold posts are only placed at every third row of trees.
With a special screw connection (Frustar First III), the ropes and wires are screwed together, thus enabling each row of trees to be protected with a net sheet.
The 3 row system allows the use of a 3 row sprayer.